Fluidra installs giant solar array to power Keysborough factory

Fluidra has taken a significant step towards sustainability with the installation of a state-of-the-art solar power system at their manufacturing facility in Keysborough that will significantly reduce their reliance on non-renewable energy sources.
Brendan Butler, Fluidra’s director of operations for the APAC region, says this ambitious project underscores Fluidra’s commitment to reducing their carbon footprint and promoting renewable energy.
Project specifications
• Project Size: 785kW (new installation)
• Existing Solar Capacity: 187kW
• Total Solar Capacity: 972kW
• Number of Solar Panels: 1365 x Trina Solar 575W
• Inverters: 6 x Sungrow 110kW
• Annual Production: 975,000kWh
• Carbon Savings: 1050 tonnes per year
The new installation features 1365 high-efficiency Trina Solar 575W panels, known for their superior performance and reliability. These panels are paired with six Sungrow 110kW inverters, ensuring optimal energy conversion and system efficiency. Together, they will produce an impressive 975,000kWh of clean energy annually, significantly reducing the facility’s reliance on non-renewable energy sources.
Butler says that by embracing solar energy, Fluidra is not only cutting operational costs but also contributing to a healthier planet. Fluidra’s expanded solar capacity is expected to save approximately 1050 tonnes of carbon emissions each year. This reduction is equivalent to planting over 50,000 trees or removing 225 cars from the road annually.
“This solar project is a testament to Fluidra’s dedication to sustainable practices and innovation. It aligns with their broader environmental goals and sets a benchmark for other companies in the industry. Fluidra’s proactive approach to sustainability demonstrates their leadership and commitment to making a positive impact on the environment,” he says.
Global ESG commitment
Fluidra is committed to integrating sustainability and ESG (Environmental, Social, and Governance) criteria across all aspects of its business. As part of its Responsibility Blueprint 2020-2026, Fluidra aims to achieve 100 per cent renewable energy usage and carbon neutrality for its operations (Scopes 1 and 2) by 2027.
“Fluidra’s new solar installation in Keysborough is more than just an energy project; it’s a bold statement about the future of manufacturing and the role of renewable energy in creating a sustainable world. With this initiative, Fluidra is paving the way for a greener tomorrow, one solar panel at a time.”